The library is getting a new entrance door. This will be installed on Monday 26.09.24 and Tuesday 27.09.24. The work will be carried out in such a way that it will still be possible to enter the building.
Please note, however, that there may be increased noise pollution on these days.
Update 28.08.24: A small error has snuck in with the dates. The installation was originally scheduled for the 26th and 27th of August. Due to supply shortages, this is now likely to be moved to September. Exact date to follow.
